HDPE butt-fusion field checklist
All Articles
How-to 2026-03-026 min read

HDPE butt-fusion field checklist

Twelve items every crew should confirm before joining PE100 dredge pipe in the field.

Before the machine is switched on

Match SDR and resin grade on both ends, clean and dry the pipe, shield the joint from wind and rain, and confirm the clamps hold both ends coaxially.

During fusion

Follow the heater plate temperature, bead-up, soak and cooling times exactly. Never shorten the cooling stage — most field failures start there.

After fusion

Inspect the double bead for symmetry, record joint number, operator and parameters, and keep the log with the as-built pipeline drawing.

Need this specced for your site?

Send diameter, working pressure and deployment environment — we reply with a matched solution within 24 hours.

Get A Matched Solution
Heartwork
Talk to the author
Lira Kung
International Business Dept · SHANDONG HEARTWORK SUPPLY CHAIN MANAGEMENT CO., LTD.

Need a specification check, a price band or a lead-time estimate for your project? Send me the working conditions (diameter, pressure, medium, length) and I will reply personally, usually within one working day.

Keep Reading

More from the engineering desk